PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started installing top metal track at the 4th Floor Facing East (800x600).jpg Unloaded duct work for the 2nd Floor Facing South (800x600).jpg Welded clips along the column at the 2nd floor (North Elevation) (1) (600x800).jpg Welded clips along the column at the 2nd floor (North Elevation) (2) (600x800).jpg Welding clips along the column at the 2nd Floor  West Elevation (800x600).jpg Installed conduit all the way up to the 4th Electrical Room 469 Facing South (800x600).jpg Installing duct work at the 1st Floor Facing East (800x600).jpg Installing split wire above the cealing at the 4th Floor Facing West (800x600).jpg Welding clips along the columns at the 4th Floor East (800x600).jpg
Previous pageNext page Welding clips along the column at the 2nd Floor  West Elevation (800x600)
Welding clips along the column at the 2nd Floor West Elevation (800x600)